You don't have javascript enabled. Good luck with that.
Pencarian
 Antisipasi Genangan, Satpel SDA Tanjung Priok Keruk Saluran Phb Danau Indah Barat

Danau Indah Barat Connecting Channel Dredged

Tanjung Priok Sub-district Water Resources Unit dredged mud sedimentation from Danau Indah Barat connecting (phb) channel, Sunter Jaya Urban Village, Tanjung Priok Sub-district, North Jakarta.

Dredging starts today and is targeted to complete in early April 2021

Tanjung Priok Sub-district SDA Unit Head, Deny Tri Hendarto mentioned, dredging was carried out to normalize Danau Indah Barat connecting channel thus it can be optimal in function and hold more water.

"Dredging starts today and is targeted to complete in early April 2021," he conveyed, Wednesday (3/17).

Rawa Kepa Connecting River Being Dredged for Maximum Water Capacity

Danau Indah Barat connecting channel has length of 550 meters, width of 2.5 meters, and depth of 2.5 meters with mud thickness of one meter.

"In this dredging, we use one wheel excavator and three dump trucks. We also deploy three Tanjung Priok SDA Unit to dredge this connecting channel," he explained.

Through dredging, his side hopes connecting channel can hold more water, especially when heavy rain falls thus it can minimize inundation.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye416 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye381 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye347 personNurito