You don't have javascript enabled. Good luck with that.
Pencarian
 Antisipasi Genangan, Satpel SDA Tanjung Priok Keruk Saluran Phb Danau Indah Barat

Danau Indah Barat Connecting Channel Dredged

Tanjung Priok Sub-district Water Resources Unit dredged mud sedimentation from Danau Indah Barat connecting (phb) channel, Sunter Jaya Urban Village, Tanjung Priok Sub-district, North Jakarta.

Dredging starts today and is targeted to complete in early April 2021

Tanjung Priok Sub-district SDA Unit Head, Deny Tri Hendarto mentioned, dredging was carried out to normalize Danau Indah Barat connecting channel thus it can be optimal in function and hold more water.

"Dredging starts today and is targeted to complete in early April 2021," he conveyed, Wednesday (3/17).

Rawa Kepa Connecting River Being Dredged for Maximum Water Capacity

Danau Indah Barat connecting channel has length of 550 meters, width of 2.5 meters, and depth of 2.5 meters with mud thickness of one meter.

"In this dredging, we use one wheel excavator and three dump trucks. We also deploy three Tanjung Priok SDA Unit to dredge this connecting channel," he explained.

Through dredging, his side hopes connecting channel can hold more water, especially when heavy rain falls thus it can minimize inundation.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Routes Amid Demonstrations

    access_time28-10-2026 remove_red_eye611 personAldi Geri Lumban Tobing
  2. Jakarta to Host World Cities Culture Summit 2027

    access_time31-10-2026 remove_red_eye564 personBudhi Firmansyah Surapati
  3. Central Jakarta Helps 879 Residents Retrieve Withheld Diplomas

    access_time30-10-2026 remove_red_eye564 personFolmer
  4. Tourism Industry Workforce Capacity Continues to Be Improved

    access_time30-10-2026 remove_red_eye558 personAldi Geri Lumban Tobing
  5. Free Health Checks and TB Screening Held at RPTRA Tamplas Bambu

    access_time30-10-2026 remove_red_eye551 personNurito